Monday, October 13, 2014

Everything's Coming Up Solar

At this point we have sent away our list for the parts we need, and we will be getting them soon.  In the mean time, we plan on attaching all the other parts on SK2 that we can that don't involve the parts we are waiting for.  With that said, are goals this week are . . .

a) changing the suspension

b) placing the motor

c) placing the tie bars

We will have to find the necessary bolts to attach the motor, and we will have to thread the hole to be able to bolt in the tie bars on SK2.  The current suspension is very weak, but changing it should not be a problem.  After the motor is mounted, we will connect it to the back wheel motor with a chain.  If all goes well, all that will be left is to fix the steering, putting on the tires, and wiring the controllers.
Jaret and Jack placing the motor on SK2
Zach and Jack changing the suspension on SK2